McDonald's Nationwide Water Filter System Installations
McDonald's, the largest restaurant chain worldwide, partnered with Barranco to deploy a nationwide water filter system across 700 sites in 13 states. This extensive project, which had a 6-month timeline, was essential to maintaining the quality and consistency of water for food preparation and customer-facing needs. The system would be further expanded in 2025 to cover additional locations.
Project Scope
- Client: McDonald's 
- Number of Sites: 700 
- Operating States: 13 
- Project Timeline: 6 months (with an expansion planned for 2025) 
- Scope of Work: Water Filter Installation 
- Completion: 2024 expansion in new states 
Challenges:
- Logistics Coordination: With 700 sites across 13 states, coordinating equipment, teams, and materials for consistent and timely installations was a significant challenge. 
- Time Constraints: Completing the installations within 6 months while maintaining operational efficiency in each restaurant was a critical deadline. 
- Operational Disruption: Minimizing any disruption to McDonald's daily operations, particularly during peak hours, required careful planning and scheduling. 
Solution:
- Efficient Scheduling: Barranco developed a strategic, phased approach for installation, scheduling work across all 700 locations to minimize downtime and avoid interfering with daily business operations. 
- Skilled Labor: Barranco deployed experienced teams equipped with the necessary tools to ensure the water filter systems were installed to the highest standards. 
- Clear Communication: Regular updates and clear communication with McDonald's and local managers ensured the project stayed on track and that each location received the appropriate materials on time. 
Results
- Successful Installation: All 700 locations had the water filter system installed within the 6-month timeline, meeting McDonald's standards for operational consistency and water quality. 
- Minimal Disruption: The project was executed during non-peak hours, ensuring minimal impact on the daily operations of each location. 
- High-Quality Outcome: The water filter systems now provide reliable, consistent water quality for all McDonald's locations, enhancing the customer experience and supporting food safety standards. 
Conclusion:
Barranco's ability to coordinate a large-scale, multi-state installation project with precision and efficiency ensured the successful delivery of McDonald's nationwide water filter system. The seamless execution and commitment to quality reaffirmed Barranco's role as a trusted partner in large-scale operational projects for major brands. With a continued partnership and a planned expansion in 2025, Barranco remains committed to ensuring McDonald's operational success through reliable, top-tier service.